On Wednesday evening August 17, over 30 firefighters from Winfield, Mt. Airy, and New Windsor participated in a rural water supply training exercise within Winfield's first due response area. The emphasis of the training was to practice skills needed for rural water supply such as drafting and fill site operations, tanker shuttles, dumpsite operations, and implementation of a master stream to try and flow 500 gallons per minute uninterrupted to simulate extinguishing a large structure fire. Engine 101 and Utility 14 setup Fill Site #1 at the pond across from the Winfield Fire Station, while Brush 105 and Duty 14 setup Fill Site #2 on Freter Road at the stream. Engine 141 and 142 set up the dumpsite and fire attack. Tanker 1, Tanker 14, and Engine 12 shuttled water from the fill sites to the dump site. This type of local training has proven invaluable when the need arises to work a rural water shuttle on an actual incident.
This drill also gave the personnel from the Mt. Airy VFC a chance to train with their tanker just received from the manufacturer. "Tanker 1", a 2011 Mack/4Guys was received on August 1. This unit carries 3500 gallons of water, has a 1500 gallons per minute Hale pump, and is equipped with side and rear dumps, dual 5" direct fills on the tank, and hardware necessary to support a rural water supply operation. Driver and personnel training are well underway and the unit should be ready for service in early September.
Story and Photo's courtesy of www.winfieldvfd.org |